installation Manual
12
When installing a system with 2 or more transmitters it is mandatory to use
the following best installation practices of PLC circuits to ensure a trouble-
free installation.
PV CONDUCTOR INSTALLATION
- MULTI-TRANSMITTER SYSTEMS -
REQUIRED PRACTICES
These practices are required in multi-transmitter installations.
DO ✓
DO NOT ✗
Run positive and negative
conductors from the same
string and RSS transmitter
together
Do not separately run all
positives together and all
negatives together
Keep conduits associated
with dierent transmitters
as far apart as possible
Do not install conduits
associated with dierent
transmitters directly
adjacent to each other
Cable trays containing
conductors from multiple
transmitters should be as
short as possible
The longer the cable tray
the higher chance of
experiencing crosstalk
between transmitters
Once inside a cable tray
keep strings (+) and (-) as
close as possibleto a
twisted pair
Do not segregate the
positives and negatives of
strings inside a cable tray










