Instructions / Assembly

404-344-0000 • www.tiedown.com
605 Stonehill Drive SW, Atlanta, GA 30336
sales@tiedown.com
Option 1 Low Top Cap
Attach the “S” hooks
included with the top
cap hardware. Place in
mousing holes on the
back of the top cap. Tie
off the “S” hooks with
rope and secure with
cross tie.
Option 2 High Top Cap
Pass rope threw the
track section rungs. Tie
off the rope and secure
with cross tie.
Option 3
Ladder and Hoist
Anchor Kit #13809
Secure the Top Cap (Pic 5)
Building
Height
Length
of Track
Base to
Building
Building Length of Base To Track Brace Location
Height Track Building Cross Tie from Bottom
12’ 16’ 4’-6” Not Required
16’ 20’ 5’-0” Not Required
20’ 24’ 6’-6” Not Required
24’ 28’ 6’-6” Not Required
28’ 32’ 7’-6” 11th and 13th
32’ 36’ 8’-0” 14th and 16th
36’ 40’ 9’-0” 19th and 21st
40’ 44’ 10’-0” 26th and 25th
42’ 44’(max) 10’-6” 25th and 27th
Track Section Chart:
Brace Support and Proper Set Up Distance at Job Site
This table provides the suggested information for the
distance of the bottom track from the building and the
location of the track support for various conditions.
Track lengths in excess of 28 feet require the use of the
telescoping brace (#60005).