Instructions / Assembly
7 | P a g e
5. First attach the cradles to the channel above the hole where the tubes pass
through the ceiling and where the channel can be supported. Cradles should be
facing each other.
6. Bolt on the Cradles loosely where needed, and then tighten securely after
attaching and tightening the tubes #3 hardware. This is to ensure that the tubes
are flush on the cradles.
7. Drill 1/8 x 1 inch deep holes in the structure to attach the Channels. Place the
Isolation strip below the channel by cutting them in half and placing the half’s at
the point in between where the Channel meets the supports. #2 hardware and
washer isolators.
Note: It helps to have the hardware go through the holes of the Isolator.
Fold in half, Cut in half and Place the Isolators pieces between the
Supports and the Channel or Channels.
Fasten and tighten to supports well using #2 hardware and the washer
Isolators. Secure them well.
Thunder Mount Mounting Above the ceiling continued.
7a. Place the chrome ring through the tube glue it to the ceiling
after attaching the tubes.(Glue not included, contact cement works best)
You might need two people to do this next step.
Attach the shafts to the Cradles by lifting the Opener and passing the tubes,
Through the ceiling and with the #3 set 3.0 x 9/16
th
nuts and
Bolts included in the kit. Tighten the nuts and bolts to the tube then the
Cradles good and tight.
8. Attach and Secure tubes with the nut and bolts
Hardware #4