Instructions / Assembly

6 | P a g e
Thunder Mount Mounting above the ceiling continued.
Seen here is a Thunder Mount System Mounted above the
Supports with Isolators installed.
5. Attach the cradles to the channel facing away from each other above the
hole where the tubes pass through the ceiling and where
The channel can be supported securely. #3 hardware.
6. Drill 1/8 x 1 inch deep holes in the structure to attach the Channels. Place
the Isolation strip below the channel by cutting them in half and placing the
half’s at the point in between where the Channel meets the supports. #2
hardware and washer isolators.
Note: It helps to have the hardware go through the holes of the Isolator.
Fold in half, Cut in half and Place the Isolators pieces between the
Supports and the Channel or Channels.
Fasten and tighten to supports well using #2 hardware and the washer
Isolators. Secure them well.