Manual

Thrush Co.
Manual #9636-0550
4.1 Pre-Installation Assembly (Continued)
4. Unbolt shipping bracket (Figure 4-2) from base of crate. Use provided lift lugs to
slowly lift the unit from the crate. Once cleared from the crate continue to raise the
Hot-Pak to a vertical position. While lowering unit onto legs (Figure 4-3) align
mounting tabs on the
Hot-Pak with mounting holes on the stand assembly. Use
supplied bolts to attach the
Hot-Pak to the stand. Remove shipping bracket and lift
lugs.
There is a potential for severe personal injury or death if proper rigging
procedures are not followed. Rigging should be done with proper
equipment and qualified personnel.
MOUNTING
TAB S(4 )
LIFTLU G
LIFTLU G
SHIPPING
BRACKET
Figure 4-2 Crated Assembly
5. Once the
Hot-Pak is attached to the stand, the unit can be bolted to the floor.
(Figure 4-3).
(4)BOLT,5/811,1.5"
FLOOR
MOUNTINGHOLES
Figure 4-3 Stand Assembly #2