Installation & Assembly (Queen)

Step 08 - Complete Attachment of Head Board Top Rail (Part 09) to Bed Posts (Parts 01 & 02) and
Upper Head Board Part (No. 06) using 6 x Screws “AP”.
Step 09 - Foot Board Assembly OBSERVATION:
When placing Foot Board Parts (No.11,16,10 and 17) into Foot Board Bed Post Channels
(Parts 03 and 04), Do Not Completely Tighten Screws into Half Moon Nuts (Screw B and Nut BC).
This will leave loose wiggle room allowing easier placement of Boards into the Bed Post Channels.
When the Head Board is completely mounted, fully tighten all screws!
Pg 6/11
B
02x
F
01x
BC
02x
B
F
BC
B
B
F
F
BC
BC
04
03
11
11
04
03
AP
06x
AP
AP
AP
AP
DO NOT FULLY TIGHTEN SCREWS
INTO HALF MOON NUT UNTIL ALL
FOOT BOARD PARTS ARE
MOUNTED IN PLACE.
AP
AP
Observation: The Headboard is now completely assembled
and ready to attach to Bed Rails (Part 13)