Daim Ntawv Qhia Tus Neeg Siv
PD1D Piezo Inertia Drive Stage Chapter 4: Installation
Rev A, August 3, 2021 Page 9
4.1.3. Mounting Components to the Stage
CAUTION
Do not exceed the load capacity specified in Chapter 6.
The load’s center of mass should be over the platform.
Do not use screws and dowel pins that protrude past the maximum hole depth.
Figure 6 Mounting Holes on Moving Platform
Attach the load using screws and check that it is secure. We recommend aligning the load with a set of dowel pins
opposite each other relative to the center of the stage, as well as ensuring the load’s center of mass is over the
platform before driving the stage.
1. 2-56 (M2) Threaded Hole, 3 mm Deep (4 Places)
2. 8-32 (M4) Threaded Hole, 3 mm Deep, 1" (25.0 mm) Spacing (4 Places)
3. Ø2 mm Dowel Pin Hole, 1.5 mm Deep (4 Places)