Installation Guide
Doc No. 81159 Page 6 of 17 Rev D 1/17 JWJ
IMPORTANT
Once all connections are made and tested for leaks reinstall top access cover
POST Warnings for your customers
Generator size 18Wx21Dx48H
6' Main Power Cord
3/8” compression
Hose & adpt. (incl)
6' Main Power
Receptacle (incl)
Drain Hose
(As required)
PRV - ¾” NPT pipe with 6”service
connection (to outside drain)
1” NPT pipe with 6”service
connection (to steamroom)
Drain Access
Cover
Yellow Data Cable
(To main control)
Generator ID Label
Drain valve
Rear access
panel, 36” away
from the wall