Installation Guide
Doc No. 81159 Page 3 of 17 Rev D 1/17 JWJ
START HERE
This Unit is a Commercial Unit
It Must Be Installed By a Licensed Electrician and Plumber
In order to properly install this system for the first time you must have the following:
Quantity = 1, SD Series Superduty Steam Generator, per steamroom
Quantity = 1, SDK Accessory Kit, per steamroom
Included in the two kits:
Installation Instructions
Superduty Steam generator
Master Controller
Steam room sensor w/ 50 foot lead wire.
Polished chrome steam head
30 Minute Mechanical Timer w/bezel
NEMA rated wall power receptacle (240v or 480v)
100 foot data cable
20”x 3/8 comp hose
and 1/2” NPT adapter
Hardware packet
Materials Needed:
1/2” Brass ball valve for water supply
Proper electrical supply
Pipe compound
Copper or brass nipples
(Size and quantities per Instructions)
In-line filter (recommended)
1” brass or copper union
(Service disconnect)
1” x 6” NPT copper pipe nipple
3/4” brass or copper union
3/4” x 6” NPT pipe nipple
(service disconnect)
Wire (sizes and quantities per
Instructions)
Copper tubing or pipe
Wire cap nuts
Flex conduit
Brass or copper tee fitting and plug
Tools Needed:
Pipe wrench
Tubing cutter
Flaring tool (if flared fittings are used)
Pipe thread cap
Wire cutters and wire strippers
Adjustable wrench
Screwdrivers (philips and slotted)
Solder & flux
3/16” & 1-1/2” masonry drill bits
Drill motor
Propane torch
Other tools as may be required
Generator size 18Wx21Dx48H