Installation Guide
THERMASOL.COM
I
800.776.0711
Read warnings on page 3. For illustrative purposes only. Consult with qualifi ed professional for steam room construction details.
PN: 97005_NC 4/16
Steamhead Installation Instructions
When fi nalizing installation, install the steamhead into the
housing, making sure that the aromatherapy fi ll channels
are facing upwards.
To ensure that no moisture gets behind the steamhead and
into the wall, place a generous bead of waterproof silicone
around the steamhead, using the machined groove
(located on the back of the steamhead) as a guide.
Be sure there isn’t any debris within the housing, and that
the two O-rings are in place on the steamhead.
Press the steamhead into the housing until the steamhead
is tight against the fi nished wall. You may need to wipe
away any excess silicone.
Make sure aromatherapy
fi ll channels face up
Place silicone around
this groove
O-rings
This edge must be fl ush
with fi nished wall (+/- 1/8")
Finished wall
Finished wall
.63"
Contemporary
.63"
Traditional
3.5" 3.5"
3.75" 3.75"
.63" .63"
Modern Regency
A
A
B
B
C
C
D
D
4 Steamhead Installation
11