Installation Sheet

6 Water Supply and Drain Pan
THERMASOL.COM
I
800.776.0711
Read warnings on page 2. For illustrative purposes only. Consult with qualied professional for steam room construction details.
5
Once you select the generator location,
you will need to run water to the unit.
Use copper or brass ttings only!
DO NOT use galvanized ttings.
DO NOT use PEX or PVC tubing.
DO NOT plumb the pressure relief valve into the steam line.
Plumbing the pressure relief valve into the steam line can be
hazardous, should the steam outlet be capped off or obstructed.
Recommend installing unions on all rigid pipe lines for ease of
removal and serviceability (if required).
Use 3/8" NPT line to connect to supplied 3/8" braided hose.
The drain pan is required for installation.
Plumb the 3/4" drain connection on pan to an approved
drain.
Drain Pan must be installed on all
generator installations.
All plumbing shall be performed by a qualied
licensed plumber and in accordance with
applicable national and local codes.
Connect a tee to the existing cold water line.
Install copper pipe from the tee to create inlet line for unit.
Install a brass shut off valve on the water inlet line
in an accessible area in front of the brass union (and
recommended in-line water lter). A stainless steel water
supply ex connector may be used.
Pre-Installed water line debris screen (included) in the
water inlet on the generator.
Before making the water connection, ush the water line
into a ve-gallon pail to remove any silt or other materials
that may be in the water inlet line.
 Make nal connection but DO NOT turn the water
or power on yet.
A
D
B
E
F
C
Water Inlet Line
(3/8" NPT with brass
shut-off valve)
3/4" Drain Line
Steam Line
AD
B
E
F
C
PRO Series Generator Installation Instructions