Installation Sheet

81098 Page 15 of 21 REV L 10/18 NJL
Day Spa Control Installation Instructions
1. The Day Spa Time & Temp digital control must be located inside the shower area.
2. Install the touch pad 4 to 6 feet from the floor inside the steam room. Drill a 1-1/16” hole in the wall.
3. Bring the control cable from the Steam Distribution System (DS-SDS) through the 1-1/16” hole. Using
the coupler, connect the cable to the touch pad connector. Ensure the coupler is located higher in the
wall than the control. Do not pinch, nail, wedge or damage the control cable. Any damage to the
control cable could result in the control not working properly. If the control is not installed immediately,
protect the end connector with tape or some other kind of shielding material.
4. Connect the other end of the control cable to the Steam Distribution System (DS-SDS) BEFORE
turning power on to the Generator and the Steam Distribution unit.
5. Turn on both water, power to the Generator and switch on the Steam Distribution unit.
6. Test the touch pad to ensure it is properly connected. If any problems arise, call THERMASOL-
Technical Support (800) 776-0711.
7. THESE STEPS MUST BE TAKEN OR YOUR WARRANTY WILL BE VOID. Coat the entire control
back with supplied waterproof silicon. Completely seal the control to the wall so moisture does not get
behind it. Place the control on the wall pressing firmly. You may need to tape the control into place
until the silicone dries. Be careful not to harm the wall and/or control with the tape. (Figure 6)
Note - Let newly installed control dry for 24 hours before using steam bath.
Failure to follow installation instructions specifically will cause the warranty to be void!
1-1/16” hole in wall
for control wire
50 ft. control wire
from Steam
Distribution System
(DS-SDS)
Completely cover the entire back
with waterproof silicone.
Fi
g
ure 6