Installation Guide
Page 16
C - Installation using inline or remote
blowers - with ducting through left, right
or rear
RECTANGULAR DISCHARGE
COVERS
This
Front Panel
remains
in place.
(Requires purchase of 1-7/8” x 19” (48mm x 483mm) to 6, 8, or 10”
(152mm, 203mm, or 254mm) round transition. 1-7/8” x 19” (48mm x
483mm) rectangular duct and connection adapters are also available.)
1. Remove only one RECTANGULAR DISCHARGE COVER.
2. Use nuts to connect 1-7/8” x 19” (48mm x 483mm) rectangular ductwork
connection adapter or 1-7/8” x 19” (48mm x 483mm) to 6, 8, or 10”
(152mm, 203mm, or 254mm) round transition to housing when installing
ductwork.
DUCTING OUT RIGHT SIDE OF
HOUSING SHOWN.
Cut out ductwork opening in cabinet
1. Measure and mark where to cut the ductwork opening in the cabinet
based on the ducting option selected. Use the dimensions in the
illustration below to help plan how and where to provide duct access
through your cabinet.
INSTALLATION
CENTER LINE
INSIDE
CABINET
BACK
INSIDE
CABINET FLOOR
1½”
(38)
21”
(533)
centered
4”
(102)
21”
(533)
A
/
8
7
REAR CORNER OF
DOWNDRAFT CUT-OUT
24¾” (629)
4 ”
(105)
/
8
1
5 ”
(149)
/
8
7
4”
(102)
HOLE FOR
1- ” x 19”
(48 x 483)
DUCT &
TRANSITIONS
Hole in Cabinet Floor
Dimension A
Using Flex Blower (Model
VTD600P & 8” (203mm) round
duct straight down through
cabinet oor.)
(1½"/ 38mm left of installation
center line)
7¾ inches (197mm)
2. Set downdraft into cabinet/countertop opening as far back as possible
and make sure it is level.
INSTALLATION
Measurements in
inches (mm).










