Installation Guide
Installation InstructionsEnglish | 20 |
3. Plug the wire connector assembly supplied with the
blower housing to the mating cable connector from the
range hood.
A.
A
B
C
Hood assembly connector
B. Plastic cable holders
C. Cable holder screws
Mounting the lower duct covers
1. Place the lower duct covers over the hood assembly.
2. Assembly the two pieces over the upper duct cover
assembly.
Slide the edge of the duct cover under the clip
located in the opposite duct cover.
Push them until you hear a click. The bulges on the
edge of the duct covers has to enter in the clip
slots.
3. Slide the lower duct cover assembly down to the base of
the hood.
Recirculating Kit (optional)
When used in recirculation mode, To Reduce the Risk of
Fire and Shock use only conversion kit Model RECHMIB.
If it is not possible to vent cooking fumes and vapors to
the outside, the hood can be used in the non-vented
(recirculating) version, using the recirculating kit .
Fumes and vapors are recycled through the grid.
See optional accessories section.
1.
support with 2 assembly screws pèr side.
2. Measure length of 8” (20.3 cm) vent needed to connect
NOTE: Flexible Vent may needed.
minimum.
3.
NOTE: To make vent installation easier, temporarily
and replace after vent section is in place.
4. Seal all connections with vent clamps.