Installation guide
INSTALLATION
7.
Screw
in
lower
screws
(hex
screws).
8.
Stick
protective
film
over
the
holes
of
the
2
lower
mounting
bolts
in
the
protective
grid.
a
9.
Connect
up
the
air
outlet
pipe.
10.
Connect
the
hood
to
the
electricity
supply.
11.
Remove
the
protective
film
from
the
two
flue
ducts.
Take
care
not
to
damage
the
surfaces
which
are
susceptible
to
scratches
etc.
Warning:
The
interior
walls
of
the
flue
panelling
can
have
sharp
edges
—
Risk
of
injury
-.
We
recommend
that
you
wear
gloves
when
installing.
12.
Push
both
sections
of
the
flue
panelling
together
(slots
in
the
upper
section
must
be
pointing
downwards)
and
insert
into
the
opening
in
the
hood.
Protect
the
cover
panels
from
scratches,
for
example
by
laying
the
template
used
for
marking
the
wall
over
the
top
edge
of
the
lower
section.
13.
Insert
the
cover
panels
at
an
angle
and
tilt
them
back.
14.
Slide out
the
upper
section
and
attach
it
to
the
mounting
brackets
at
the
sides
with
two
screws.
15.
Insert
the
grease
filter
(refer
to
Operating
Instructions).
If
the
vent
system
does
not
operate
satisfactorily
during
any
of
the
above
procedures,
review
all
steps
in
these
Installation
Instructions
to
ensure
that
nothing
has
been
omitted
or
overlooked.
Also,
refer
to
the
Care
&
Use
Manual
for
additional
information
or
call
Thermador
Customer
Support
1-800-735-4328.