Installation Guide

Activating your warranty only takes a moment and ensures that we
are able to offer the best service possible to you. Visit us at
www.thermablaster.com or you can use the mail in form at the back
of the product manual.
REGISTER TODAY!
6,000 BTU Blue Flame Wall Heater
Model: WDFT060-VF
Dual Fuel
Adjustable temperature settings determine the length of time that
the heater will operate at maximum BTU to achieve desired temperature,
not the actual flame height.
During first seasonal use, gas smell is expected to be more noticeable than in
standard operation.
Operation Notes:
To stop the heater, shut off the safety valve on the gas inlet line. Then,
turn the heaters Gas Valve Button to the OFF position.
Shutdown Process:
6. The heater will now operate normally. You should adjust the Thermostat
Knob to your desired heat setting. Room temperature will vary based
on individual room size and installation.
5. Once the pilot flame is stable, turn from the Pilot setting to the Burner
position . This should be done slowly in one motion, without
stopping between positions.
4. Release both buttons. Should the pilot go out, repeat steps 3 and 4.
3. While continuing to keep the Control Knob pushed in, also push
down on the Igniter Button thoroughly until ignition can be heard.
Continue to hold down both buttons for at least 15 seconds, until the
pilot is touching the thermocouple and is noticeably heated.
2. During the first seasonal operation, set the Control Knob to Pilot, then
hold down on the Control Knob for 3-5 minutes. This allows the air in
the manifests to clear completely. During normal operation, you will
only need to hold the Control Knob down on Pilot for about 5 seconds.
1. Turn the Thermostat Knob to the widest area, representing full heat.
Next, turn the Control Knob to the Pilot setting.
Ignition Process:
Follow these steps to ensure that your heater
is running the right way, every time.
Operational Instructions