Installation & Assembly
Slide the medium decorative nut (H) followed by the plastic
slip joint washer (Z5) to the bottom end of the 47" stainless steel tube and
loosely attach to the receiving thread of the conversion panel (E). (Fig 5)
Install the nipple (P) to the water fitting from the wall. Slide in
the flange (Q) onto the nipple (P) and install the shut off valve (N). (Fig 7)
Turn on the shut off valve and fill the tank to its waterline and
test flush system,checking for leaks. (Water level is preadjusted from
the factory; in some instance re-adjustment might be necessary.
Caution: Before turning on the water, please make sure that all
parts are installed properly. Never use abrasives, detergents or
acids to clean the unit. Use only mild soap and water with a soft
cloth to clean the set, the use of harsh chemicals and abrasives of
any kind will damage the set which will not be covered by the
warranty.
Note: Steps 6 & 7 involves slight pulls and pushes of the 47"
stainless steel tube that will enable proper fitting of the 47"
stainless steel tube (G), then check final alignment of the tube
and tighten all joints.
Note: Please wrap both sides of the nipples with thread sealer.
Slide brass slip joint nut (Z6) followed by plastic slip joint
washer (Z5) and large decorative nut (J) with rubber washer (K) into
top end of the 47" stainless steel tube (G), Insert rubber water restrictor
(Z7) inside the 47" stainless steel tube (G) and loosely attach the
large decorative nut (J) to the receiving thread of the flush valve (A2)
on the woodtank slightly tighten all joints. (Fig 6)
47" Tube (G)
47" Tube (G)
These instructions and drawings disclose confidential and other data of proprietary
nature owned by Renovator's Supply, Inc. and may not be used or disclosed to
others without the prior consent of Renovator's Supply, Inc.
Slide the small brass decorative nut (V) from the opposite
end of the 1/2" water supply line (L) (non collared end), and insert cone
washer (W) in between the 1/2" water supply line (L) and the small brass
decorative nut (V) on the collared end. Connect the small brass decorative
nut (V) to the fill valve receiving thread and hand tighten, connect 1/2" water
supply line (L) and 12" supply line (O) using the compression coupling (M),
then remove the nut and brass sleeve from the shut off valve (N), align the
12" supply line (O) to the shut off valve (N) measure appropriate length and
trim accordingly. Slide the brass nut followed by the brass sleeve removed
from the shut off valve earlier onto the 12" supply a wrench and make sure
all connections are squarely aligned to assure no leakage. Do a final check
that all connections are tightened. (Fig 8)
Fasten conversion panel (E). Place cover plate (F) on top of
conversion panel (E) and secure with cover plate screws (T4). (Fig 5)
ZpipeRev052010