Installation Guide
2
Optional Base Ring
Stainless Steel Washer
Stainless Steel Mounting Nut
Stainless Steel Crosshead Screws
Ø 1- 1/2” fast water jet hole in
counter top
Ø 1-3/8” drill hole in counter top
Mounting Shank
Installation
Step 1
Step 2
Step 3
Hand Spray Supply Hose
Hand Spray Hose
Cold Supply
Hot Supply
Check Valve Housing
VERY IMPORTANT!
Step 5
Step 4
Step 6
Note: make sure the Hand Spray Hose and
Counterweight are free to extend or retract and
are not in conflict with any plumbing components
or items under the sink or Workstation.
H
C
1”
The Galley BarTap
®
comes with
an Optional Base Ring. It can be
installed with the Base Ring or
without it.
Insert all hoses and Mounting
Shank through the hole in counter
top.
On the underside of the counter
top, install the stainless steel
Washer and Mounting Nut by
slipping them over the hoses
and threading the nut onto the
Mounting Shank. Tighten the
Mounting Nut against the counter
top and tighten the two screws so
the faucet is secure.
Install the Counterweight onto the
Hand Spray Hose as shown.
Proper placement of the
Counterweights is critical for the
proper retraction of the spray hose.
Hand Spray Hose
Connect the Hand Spray Hose to the
Hand Spray Supply Hose on which
the Check Valve housing is fitted.
Before connecting the hot and cold
Supply Hoses, flush water supply
stops to clear any debris. Place
a bucket underneath the stops
and run water for 5 to 10 seconds.
Carefully turn on the water.
Carefully position hot and cold
supplies so they will not interfere
with other hoses.
Connect the 3/8” Compression
Connections (Hot and Cold Supply
Hoses) to your hot and cold inlets.
Hoses are marked hot and cold.