Installation Instructions

3. INSTALL THE WORKSTATION BASIN
a) A support frame (cleat system) will need to be built
and installed into the cabinet(s). This frame will support
the weight of the Workstation. Note: Clips are NOT to
be used.
b) Construct the support frame so that the inside
dimensions are 1/2" larger than the basin’s inside
dimensions. Please refer to pages 1-3 for your
Workstation dimensions.
NOTE: For a Workstation + DryDock™, the support
frame must be built with 1” x 2” boards.
a) Carefully place the Workstation into the cabinet
by resting the flanges on the support frame. All four
flanges should rest upon the support frame.
b) Use a level to ensure that the flanges are level.
c) The top of the flanges should be flush with the top
of the cabinet.
1. CONSTRUCT SUPPORT STRUCTURE
**IMPORTANT**
Support frame must be installed 1/16" lower than the
top of the cabinet. Once installed, the top of the
Workstation Flanges will be flush with the top of the
cabinet.
Use a level to ensure that the support frame is
installed level in the cabinet.
2. ATTACH THE SUPPORT FRAME TO THE
INTERIOR WALLS OF THE CABINET
5
1” x 6” HARDWOOD BOARDS ARE RECOMMENDED
EXCEPT FOR WORKSTATION + DRYDOCK, FOR
WHICH 1” X 2” ARE RECOMMENDED.
OVERHEAD VIEW