Instructions / Assembly
11
INSTALLATION
STEP 5
STEP 6
23
29
Warning: cylinder valve
should be facing the
same direction as the
arrow of the bottom
panel.
Place 4.5 lbs gas cylinder (23) into bottom panel (29).
20
23
25
25
A. Connect regulator and hose assembly (20) to gas cylinder and turn counter clockwise to
tighten it.
B. Insert the cylinder connection bar (25) into cylinder connection bar bracket (9) holes and
then lift it up to position to secure as illustrated. Pull or press down the cylinder connection
bar (25) if needed.
9