Datasheet

5.11 TP1 Test Point
6 Test Setup and Results
50
55
60
65
70
75
80
85
90
95
100
0 50 100 150 200 250 300
Vin=5V
Vin=3.6V
Vin=1.8V
Time=20ms/div
IL =50mA/div
OUT =5V/div
EN=2V/div
VO=5V/div
www.ti.com
Test Setup and Results
This test point can be used to measure the small signal control loop gain and phase with a Venable or
similar gain phase analyzer. The user must replace the 0-ohm resistor in R3 or R4 with a 49.9-100 ohm
resistor before attaching a gain/phase analyzer between the output voltage and TP1.
Figure 2. Efficiency at OUT
Figure 3. Startup with V
IN
= 3.6V and R
LOAD
= 1500
SLVU327 October 2009 TPS61093EVM-519 User's Guide 7
Submit Documentation Feedback