Datasheet

Test Setup and Results
www.ti.com
2 Test Setup and Results
This section describes how to properly connect, set up, and use the TPS54719EVM-152 evaluation
module. The section also includes test results typical for the evaluation module and covers efficiency,
output voltage regulation, load transients, loop response, output ripple, input ripple, and start-up.
2.1 Input/Output Connections
The TPS54719EVM-152 is provided with input/output connectors and test points as shown in Table 4. A
power supply capable of supplying 5 A must be connected to J1 through a pair of 20 AWG wires. The load
must be connected to J3 through a pair of 20 AWG wires. The maximum load current capability must be at
least 7 A to use the full capability of this EVM. Wire lengths must be minimized to reduce losses in the
wires. Test-point TP1 provides a place to monitor the V
IN
input voltages with TP2 providing a convenient
ground reference. TP8 is used to monitor the output voltage with TP9 as the ground reference.
Table 4. EVM Connectors and Test Points
Reference Designator Function
J1 V
IN
(see Table 1 for V
IN
range).
2-pin header to allow connection of an external track in voltage to SS/TR. Use with optional resistor
J2
divider of R5 and R6
J3 V
OUT
, 1.8 V at 7 A maximum
JP1 2-pin header for enable. Connect EN to ground to disable, open to enable.
JP2 2-pin header for to allow pull-up of PWRGD to V
IN
TP1 V
IN
test point at V
IN
connector
TP2 GND test point at V
IN
TP3 Slow-start monitor test point
TP4 PH test point
TP5 PWRGD test point
TP6 GND test point
TP7 Test point between voltage divider network and output. Used for loop response measurements.
TP8 Output voltage test point at OUT connector
TP9 GND test point at OUT connector
4
TPS54719EVM-152, 7-A, SWIFT™ Regulator Evaluation Module SLVU732June 2012
Submit Documentation Feedback
Copyright © 2012, Texas Instruments Incorporated