Datasheet
Table Of Contents
- 1 Introduction
- 2 TPS54386EVM Electrical Performance Specifications
- 3 Schematic
- 3.1 Sequencing Jump (JP3)
- 3.2 Enable Jumpers (JP1 and JP2)
- 3.3 Test Point Descriptions
- 3.3.1 Input Voltage Monitoring (TP1 and TP2)
- 3.3.2 Channel 1 Output Voltage Monitoring (TP3 and TP4)
- 3.3.3 Channel 1 Loop Analysis (TP5, TP6, TP7 and TP8)
- 3.3.4 Channel 1 Switching Waveforms (TP9 and TP10)
- 3.3.5 TPS54386 Device Ground (TP11)
- 3.3.6 Channel 2 Switching Waveforms (TP12 and TP13)
- 3.3.7 Channel 2 Loop Analysis (TP14, TP15, TP16 and TP17)
- 3.3.8 Output Voltage Monitoring (TP18 and TP19)
- 4 4 Test Set Up
- 5 TPS54386EVM Typical Performance Data and Characteristic Curves
- 6 EVM Assembly Drawings and Layout
- 7 List of Materials

www.ti.com
4.3 Start Up / Shut Down Procedure
4.4 Output Ripple Voltage Measurement Procedure
4.5 Control Loop Gain and Phase Measurement Procedure
7. Control loop gain can be measured by:
20
ChannelB
LOG
ChannelA
æ ö
´
ç ÷
è ø
4.6 Equipment Shutdown
4 Test Set Up
1. Increase VIN from 0 V to 12 V
DC
.
2. Vary LOAD1 from 0 – 2 A
DC
3. Vary LOAD2 from 0 – 2 A
DC
4. Vary VIN from 9.6 V
DC
to 13.2 V
DC
5. Decrease VIN to 0 V
DC
6. Decrease LOAD1 to 0 A.
1. Increase VIN from 0 V to 12 V
DC
.
2. Adjust LOAD1 to desired load between 0 A
DC
and 2 A
DC
.
3. Adjust VIN to desired load between 9.6 V
DC
and 13.2 V
DC
.
4. Connect oscilloscope probe to TP3 and TP4 or TP18 and TP19 as shown in Figure 3 .
5. Measure output ripple.
6. Decrease VIN to 0 V
DC
.
7. Decrease LOAD1 to 0 A.
1. Connect 1 kHz to 1 MHz isolation transformer to TP6 and TP8 as show in Figure 4 .
2. Connect input signal amplitude measurement probe (Channel A) to TP8 as shown in Figure 4 .
3. Connect output signal amplitude measurement probe (Channel B) to TP6 as shown in Figure 4 .
4. Connect ground lead of Channel A and Channel B to TP5 & TP7 as shown in Figure 4 .
5. Inject 30 mV or less signal across R1 through isolation transformer.
6. Sweep frequency from 1 kHz to 1 MHz with 10 Hz or lower post filter.
8. Control loop phase is measured by the phase difference between Channel A and Channel B.
9. Control loop for Channel 2 can be measured by making the following substitutions.
a. Change TP6 to TP16
b. Change TP8 to TP14
c. Change TP5 to TP17
d. Change TP7 to TP15
10. Disconnect isolation transformer before making any other measurements (signal injection into
feedback may interfere with accuracy of other measurements).
1. Shut down oscilloscope
2. Shut down VIN
3. Shut down LOAD1
4. Shut down fan
SLUU286 – March 2008 A 12-V Input, 5.0-V and 3.3-V Output, 2-A Non-Synchronous Buck Converter 11
Submit Documentation Feedback