Datasheet
SLUU172 − October 2003
10
Evaluation Modules for −48-V Hot Swap Controllers
3.2 Verifying the EVM Operation
The following procedure steps may be used to verify functional operation of the EVM after
receipt.
3.2.1 Equipment Setup
1. On the EVM board, place the POWER switch in the OFF position, and verify that the
ENABLE switch is in the OFF position.
2. Set the DIP switches 1 through 4 of switch SW1 to the ON position.
3. Turn on the power supply and adjust the output for about 48 V. Verify the supply current
limit is set to allow at least 3 A. Turn off the power supply.
4. Connect the EVM and test equipment as shown in Figure 3.
5. On the oscilloscope, set the channel amplifiers to the following scales:
• CH1: 20 V/div
• CH2: 2 V/div
• CH3: 5 V/div
• CH4: 20 V/div
For easier correlation to the information in this document, the scope trace baselines can be
positioned as shown in Figure 4.
6. Set the scope to trigger on the rising edge of Channel 1, at approximately a 10-V level.
Set the scope timebase to 10 ms, and the trigger mode to NORMAL.
UDG−03019
OSCILLOSCOPE
CH 1
CH 2
CH 3
CH 4
POWER
SUPPLY
−+
J2 (−48V_IN)
J1 (−48V_RTN)
TP2
TP4
TP3
TP16
TP15
TP14
TP8/TP12 (GND)
VOLTS COM
DIGITAL
VOLTMETER
−48-V Hot Swap Controller
Evaluation Module
(TPS2398EVM/TPS2399EVM)
Figure 3. Evaluation Module Setup