Datasheet

Quick Start List for Stand-Alone
2-5
Operation
Power Up
12) Verify correct voltage and input polarity and set the external power supply
to ON. If V
CC
and an onboard regulator EVM are used to provide V
DD
, set
platform power switch S1 to ON.
Platform LED2 should light indicating the presence of V
DD
, and the evaluation
modules installed on the platform should begin operation.
13) Adjust the signal source level as needed.
2.3 Quick Start List for Stand-Alone
Follow these steps to use the TPA2000D4 EVM stand-alone or when
connecting it into existing circuits or equipment. Connections to the
TPA2000D4 module header pins can be made via individual sockets,
wire-wrapping, or soldering to the pins, either on the top or the bottom of the
module circuit board. Numbered callouts for selected steps are shown in
Figure 23.
Figure 23. Quick Start Module Map
4
4
2
5b
6
5a
7
5a
8
Power supply
1) Ensure that all external power sources are set to OFF.
2) Connect an external regulated power supply set to 5 V to the module VDD
and GND pins taking care to observe marked polarity.