Datasheet

Quick Start List for Platform
2-4
Operation
Evaluation Module Preparations
Figure 2–2. Module Preparation
GND
RO/MO+
LO/MO–
SHUTDOWN
GND
C3
VDD GND
GND
LIN
VDD GND
GND
RIN
TPA0213 EVM Board
U1
+
TEXAS
INSTRUMENTS
2000
R4
R7
S1
R1
STEREO/MONO
C4
C5
R2
R8
C6
C1
C2
MIN
J3
J2
J1
R3
R6
R9
R5
SLOP266
SHUTDOWN
R13
R10
+
C8
C7
R12
R11
Table 2–4. Typical TPA0213 EVM Jumper Settings
EVM J1 J2
TPA0213 ON ON
Note: ON = Shunt installed, OFF = Open
Power-Up
9) Verify correct voltage and input polarity and set the external power supply
to
ON.
If V
CC
and an onboard regulator EVM are used to provide V
DD
, set
platform power switch S1 to
ON.
Platform LED2 should light indicating the presence of V
DD
, and the evaluation
modules installed on the platform should begin operation.
10) Adjust the signal source level or adjust potentiometers R4 and R8 on the
EVM as needed.