Application Guide

372 Data&Statistics Application
2. On the Actions menu, click Sort, and then click the type of sort.
Months listed chronologically but sorted by value (amount of rainfall)
Note: You can customize the order of the categories by clicking a label and dragging it.
Plotting a Value
You can plot a value on an existing plot. It displays as a vertical line in the work area.
1. From the Analyze menu, click Plot Value.
A text box with a default expression opens in the work area.
2. Type the value you want to plot, and press Enter. In this example, the value is v1:=
mean(cost).
The line is drawn at that value, perpendicular to the axis. If you have multiple plots
on the work area, a plot value segment displays for each plot.