Datasheet

PGA2310-EVM
SBOU012
3
Step 3: Double-click the PGA2310-EVM folder icon, and then
locate the Package folder. Double-click on the Package
folder icon to open the folder. Locate the file named Setup.exe.
Double-click the Setup.exe icon to start the installation pro-
cess. Follow the on-screen instructions to complete the
installation procedure.
STARTING UP THE SOFTWARE:
THE MAIN PANEL
The setup program installs a Texas Instruments folder in the
Programs folder of the Start menu. Within the Texas Instru-
ments folder is the PGA2310-EVM program. Selecting this
program will startup the applications software.
Once the program is started, the Main panel will be dis-
played, as shown in Figure 1. The Main panel allows the user
to select the parallel (or printer) port address, and either
Single or Dual DUT operation. The ‘Reset All’ button will
revert all settings to their startup defaults. Pressing the
‘DUT1 Panel’ button will open a panel containing the PGA2310
control objects, as shown in Figure 2.
DETERMINING AND SETTING
THE PRINTER PORT ADDRESS
The parallel port address for your PC can be found by going
to the Start menu and selecting the Control Panel item in the
Settings menu. When the Control Panels window opens, find
the System icon and double click it. From the System
window, select the Device Manager tab by clicking on it once.
Scroll down the list of devices until you see the Ports entry.
Double click on the Ports entry to list the PC ports. One of the
FIGURE 2. The DUT1 Panel.
ports should be a Printer Port. Double click on the Printer Port
entry to open the Printer Port window. From the Printer Port
window, select the Resources tab by clicking on it once. The
Input/Output Range is displayed (ex/ 0378 –037F). Write
down the starting number in the range (ex/ 0378), and go to
the Main panel of the evaluation module program and select
the port address that matches this number.
SINGLE OR DUAL DUT?
Most users will select Single DUT, since they will have only
one evaluation module. This will enable the DUT1 control
panel, as shown in Figure 2. If you have two demo boards
and are connecting them in a daisy-chain fashion, select Dual
DUT (Daisy-Chain). “Dual DUT (or Daisy-Chain) Operation”,
provides more details regarding daisy-chain operation.
FIGURE 1. The Main Panel.