Other Content

Table Of Contents
382 Data&Statistics Application
Months listed chronologically but sorted by value (amount of rainfall)
Note: You can customize the order of the categories by clicking a label and
dragging it.
Plotting a Value
You can plot a value on an existing plot. It displays as a vertical line in the work
area.
1. From the Analyze menu, click Plot Value.
A text box with a default expression opens in the work area.
2. Type the value you want to plot, and press Enter. In this example, the value
is v1:= mean(cost).
The line is drawn at that value, perpendicular to the axis. If you have
multiple plots on the work area, a plot value segment displays for each
plot.