Datasheet
www.ti.com
Board Configuration
If no tracking feature is required, both TRK1 and TRK2 should then be tied to VDD in order to soft-start
each output voltage based on soft-start capacitor value (Condition 3). This can be done by keeping R24,
R26, and R27 open while adding a 10Ω resistor onto R25 and R28.
Please note that the slew rate of track signal should be lower than the soft-start slew rate which is set by
soft-start capacitor value.
The following are the summary of different tracking configuration on LM3000EVAL board:
Condition R24 R25 R26 R27 R28
1 Open 10Ω 10Ω Open Open
2 10Ω Open Open 10Ω Open
3 Open 10Ω Open Open 10Ω
Figure 3. Tracking with an External Ramp for 3.3V Output
3.4 Output Voltage Ripple
Output voltage ripple measurement should be taken directly across the output capacitor C21 or C22. Care
has to be taken to minimize the loop area between the scope probe tip and the ground lead in order to
minimize noise in the measurement. This can be achieved by removing the probe’s spring tip and ground
lead and then wire a bare wire around scope probe shaft. The bare wire should be in contact with the
probe shaft since this is the “new” ground lead for the probe. The measurement can be taken by
connecting the bare wire onto the ground side of the capacitor and the probe tip onto the other side of the
capacitor. Figure 4 shows a diagram of this measurement technique.
Figure 4. Output Voltage Ripple Measurement Setup
3
SNVA389A–July 2009–Revised May 2013 AN-1951 LM3000 Evaluation Board
Submit Documentation Feedback
Copyright © 2009–2013, Texas Instruments Incorporated