Datasheet

Test Summary
www.ti.com
2.2 Recommended Test Equipment
2.2.1 Power Supplies
1. Power supply #1 (PS #1) capable of supplying 6 V at 3 A is required.
2. If not using a battery as the load, then power supply #2 (PS #2) capable of supplying up to 5 V at 4 A
is required to power the circuit shown in Figure 3.
2.2.2 Load #1 Between BAT and GND
Testing with an actual battery is the best way to verify operation in the system. If a battery is not available,
then a circuit similar to the one shown in Figure 3 can simulate a battery when connected to a power
supply.
Figure 3. BAT_Load (PR1010) Schematic
2.2.3 Load #2 Between SYS and GND
Although not required, a resistive load capable of sinking up to 3 A can be used.
2.2.4 Meters
Four equivalent voltage meters (VM #) and two equivalent current meters (CM #) are required. The current
meters must be able to measure 4-A current.
2.2.5 Computer
A computer with at least one USB port and a USB cable is required. The bq2427x evaluation software
must be properly installed.
2.2.6 HPA172 Communication Kit (USB TO GPIO)
An HPA172 USB-to-I
2
C communication kit is required.
8
WCSP-Packaged bq24272/273 Evaluation Modules SLUU916April 2012
Submit Documentation Feedback
Copyright © 2012, Texas Instruments Incorporated