Installation Manual
Table Of Contents
- Safety summary
- About this manual
- Introduction to EXPLORER 323
- To install the system
- To get started
- Before you start
- To switch on the EXPLORER 323
- To connect to the LAN interface
- To connect your WLAN-enabled device
- The EXPLORER Connect app
- To access the web interface
- To enter the SIM PIN for the terminal
- To register with the BGAN network
- Mounting calibration
- To start and stop data connections
- To make phone calls over BGAN
- To use the EXPLORER 323
- Configuration with web interface
- The web interface
- To control data connections from web interface
- To set up your data connection packages
- Multiple data connections
- Status information
- The Control panel
- To use the logs
- Terminal settings
- To set up the interfaces
- To manage VoIP phones or smartphones (Not M2M)
- Advanced LAN
- To manage connected devices (Traffic control)
- To set up tracking and location reporting
- Support features
- Advanced settings
- Passwords
- To set up user permissions
- To restore factory settings
- SIM PIN for BGAN
- To save or load a configuration
- Connection watchdog (Link monitoring)
- Terminal watchdog
- Data limits
- Call charges
- Remote management
- Remote control of tracking
- Power save
- To configure data connection types and filters
- Help desk
- Reset button
- Security
- To enter the SIM PIN in the web interface
- Maintenance and troubleshooting
- Specifications
- Command reference
- Conformity
- Glossary
- Index
Chapter 2: To install the system
98-169085-B To install the terminal 9
3. Drill the 3 holes in the roof according to the previous step.
4. Mount the terminal with the spacers/mounting plates using the 3 included M6 bolts and
washers. If the mounting plates are less than 10 mm thick, use spacers to obtain a distance
of 10 mm between the roof and the terminal bottom. This is to ensure that the ventilation
hole in the bottom of the terminal is not blocked, and to ensure free airflow under the
terminal to prevent over-heating.
5. Connect the cable from the terminal to power and LAN equipment (if used).
Refer to To connect cables on page 11.
Important
The bolts must never penetrate more than 10 mm into the bushings in the
terminal!
224 mm (Mounting holes)
120
120
120
3 pcs. M6 x 25 mm
This length suits a panel
thickness of 2-6 mm