User manual

37
210 V % h < <
150 V z z <
210 V z z <
For the first excavation: The company needs to extract
29.4 million cubic meters to reach a depth of 150
meters, and to extract 41.16 million cubic meters to
reach a depth of 210 meters.
For the second excavation: The company needs to
extract 31.11 million cubic meters to reach a depth of
150 meters, and to extract 43.554 million cubic meters
to reach a depth of 210 meters.
Data editor and list formulas
v
v lets you enter data in up to 3 lists. Each list can
contain up to 42 items. Press % # to go to the top of
a list, and % $ to go to the bottom of a list.
List formulas accept all calculator functions and real
numbers.
Numeric notation, decimal notation, and angle modes
affect the display of an element (except fractional
elements).
Example
30XPlusMV_OM.flpgl Page 37 Friday, November 14, 2014 1:57 PM