User Manual
5 First steps
28
Pos: 48 /TD/Überschr iften/5. Erste Schr itte @ 0\mod_1173774895039_ 79.docx @ 319 @ 1 @ 1
5 First steps
Pos: 49 /TD/Überschr iften/5.1 Inbetriebn ahme @ 0\mod_1185342823812 _79.docx @ 1885 @ 2 @ 1
5.1. Commissioning
Pos: 50 /TD/Erste Sc hritte/testo 320/Testo 32 0 Inbetriebnahme @ 12\mod_1 337087577642_79.d ocx @ 119173 @ @ 1
The measuring instrument is supplied with a rechargeable battery
already fitted.
> Charge the rechargeable battery fully before using the
measuring instrument, see Charging the battery, page 62.
Pos: 51 /TD/Überschr iften/5.3 Produkt kenn enlernen @ 0\mod_118534290 1015_79.docx @ 1894 @ 3 @ 1
5.2. Getting to know the product
Pos: 52 /TD/Erste Sc hritte/testo 320/test o 320 Produkt kennenlerne n Netzteil_Akku @ 11\ mod_1327396880793_79. docx @ 104592 @ 3 @ 1
5.2.1. Mains operation
If the mains unit is connected, the measuring instrument is
automatically powered from the unit.
1. Connect the mains unit instrument plug to the instrument's
micro USB socket.
2. Connect the mains plug of the mains unit to a mains socket.
During mains operation the battery is charged
automatically.
Pos: 53 /TD/Erste Sc hritte/testo 320/test o 320 Sonden/Fühler anschlie ßen @ 11\mod_13299146 29852_79.docx @ 111183 @ 235 @ 1
5.2.2. Connecting probes
Probe detection at the flue gas socket is carried out
continuously. New probes are recognised automatically.
Connect a probe to the probe socket before switching on
the measuring instrument or start sensor detection
manually after changing the probe: [Options] → Sensor
detection.