User Manual

4
Install the new component (continued).
I
Bak
e the structural adhesive so that the bonded panels reach a
temperature of 60°C–80°C (140°F–176°F) for at least 30 minutes to
achieve full strength.
WARNING: Do not allo
w the High Voltage Battery to reach a
temperature above 74°C (165°F). Heating the High Voltage Battery
above 74°C (165°F) for an extended period could result in injury to
personnel and/or damage to the battery.
5
After
refinishing, use a 360-degree spray wand of suitable length to
apply corrosion-proofing material on the inside of the enclosed area to
prevent corrosion.
Front Frame Rail Outer (Complete)
Replacement
TESLA BODY REPAIR MANUAL
F
or feedback on the accuracy of this document, email BodyRepair@tesla.com.
Updated: 24JAN18 27