User Manual
Table Of Contents
- Front Frame Rail Outer (Complete)
- Parts List
- Repair Information
- Prerequisites
- Removal
- Replacement
- Prepare for installation.
- Prepare the surfaces.
- Apply structural adhesive.
- Install the new component.
- After refinishing, use a 360-degree spray wand of suitable length to ap
- Prime any bare metal with a suitable corrosion-resistant epoxy primer.
- Install the new Shotgun Shear Wall.
- Install the new Torque Box Cover Assembly.
1
Prepare for installation (continued).
H
Mark the bond pa
th areas on the new component and the vehicle.
These areas will be prepared for bonding in the next step.
Steel-to-Steel Bond Path
Front Frame Rail Outer (Complete)
Replacement
TESLA BODY REPAIR MANUAL
F
or feedback on the accuracy of this document, email BodyRepair@tesla.com.
Updated: 24JAN18 16










