User Manual
Table Of Contents
- Front Frame Rail Outer (Complete)
- Parts List
- Repair Information
- Prerequisites
- Removal
- Replacement
- Prepare for installation.
- Prepare the surfaces.
- Apply structural adhesive.
- Install the new component.
- After refinishing, use a 360-degree spray wand of suitable length to ap
- Prime any bare metal with a suitable corrosion-resistant epoxy primer.
- Install the new Shotgun Shear Wall.
- Install the new Torque Box Cover Assembly.
2
Use a disc sander with a medium-abrasive surface conditioning disc to
r
emove any remaining materials from the bond paths. Use a belt sander
with a medium-abrasive belt for any areas that cannot be reached with
a disc sander. Vacuum any adhesive dust.
WARNING: R
emove the epoxy adhesive in a well-ventilated area. Wear
suitable personal protective equipment.
3
Remove any foam.
Front Frame Rail Outer (Complete)
Removal
TESLA BODY REPAIR MANUAL
F
or feedback on the accuracy of this document, email BodyRepair@tesla.com.
Updated: 24JAN18 11










