User Guide
11
V.1.0.R1.2022
Install foundation pins in the holes according to the instructions of the chemical anchor manufacturer. The
minimum length of the pin protruding from the foundation is shown in the drawing. Follow the setting time
of the anchors according to the manufacturer's recommendations. The labyrinth should be attached to the
foundations using washers and cap nuts. Before screwing in the nut, coat the thread with Loctite 243.
2. Placing the pins in the foundation
In the next step, install foundation pins in the holes according to the instructions of the manufacturer of
the chemical anchors. The minimum length of the pin protruding from the foundation is shown in the
drawing. Follow the setting time of the anchors according to the manufacturer's recommendations.
When drilling, be especially careful not to damage the paint coating!
Mounting plate
