Quick start Guide
BEST PRACTICES
BOLT CONNECTOR / PIN−OUT
CUSTOM / 3RD PARTY CABLES
DEVICE OPERATION
BOLT MANAGER SOFTWARE
MOUNTING
Bolt uses a 2−pin power connector.
Pin  Description
1*    GND
2    +DC
 * Pin 1 is closest to the red dot on the connector
• Test the power cable polarity with ONLY the power cable connected to Bolt. Do not connect video cables.
• Check the power cable for shorts and proper grounding.
•  Keep the transmitter and receiver at close range for 60 seconds after powering on the devices. This allows 
  them to scan for and select the best wireless channel.
•  For best results when using multiple Bolt systems in the same area, place the transmitters and receivers 
  a few feet apart from each other.
• Operation of other wireless equipment may interfere with the Bolt. Try to separate other wireless 
  transmitters and receivers as much as possible.
•  Mount the Bolt 500 transmitter vertically, keeping the antennas clear of any obstructions.
•  Orient the transmitter and receiver antennas so they are parallel to each other. 
•  For best results, orient the transmitter so it has clear line−of−sight to the receiver.
CAUTION:
Using a reverse polarity or improperly−constructed power cable can damage the product 
and is not covered under warranty.
Bolt Manager allows you to configure and upgrade your Bolt 500. It is available at 
www.teradek.com/pages/downloads. The following configuration is available:
•  Region Selection - Configure Bolt to comply with your region’s regulations governing use of the 
  5GHz spectrum.
Bolt transmitter mounted 
vertically on a camera
Bolt receiver can be 
mounted vertically on 
a light stand or monitor


