User manual
Cyclone Enclosure User Manual page 18
Single Feed Operation (factory default)
Enclosure and projector share the same electrical circuit.
Circuit must be powered ON 24/7.
Connect incoming power to the terminals labeled MAINS:
(E) Earth/Ground
(L) Live
(N) Neutral
E L N
Split Feed Operation
Enclosure and projector have separate electrical feeds.
The enclosure circuit must be powered ON 24/7.
When splitting the feeders, both circuits should be on the same phase and at the same supply
voltage.
1 Use a wire cutter to cut the copper links on the
DEC3.2 board in four places.
2 Connect incoming ENCLOSURE power to the
terminals labeled MAINS. This supply MUST be
maintained 24/7.
(E) Earth/Ground (L) Live (N) Neutral
3 Connect incoming PROJECTOR power to the
terminals labeled SPLIT:
(E) Earth/Ground (L) Live (N) Neutral
E L N
Projector
Power
E L N
Enclosure
Power
1










