Installation Instructions
56025001 Page © 2003 Telular Corporation
9
3.0 GETTING READY
Before attempting to connect Telguard to the host C/C, please note the following:
1. Be sure you have all the proper parts before you go to the job site. The following items are
shipped with each Telguard unit:
Basic Telguard unit in a metal enclosure.
UL Listed plug-in transformer.
Antenna.
3-foot modular plug-to-plug cord for connecting Telguard to RJ11X jack.
Telguard Installation and Operating Instructions Manual
Telguard TG-5 Home Owner Manual
Backup Battery must be provided by installer.
2. You must also have certain installation test tools.
• A standard telephone or lineman's buttset is required at the job site for use in programming
the unit.
4.0 INSTALLATION SUMMARY
There are five steps in installing Telguard properly. IF YOU DO NOT PROCEED IN THE ORDER AND
MANNER PRESCRIBED, YOU MAY NOT COMPLETE THE INSTALLATION IN THE TIME
ALLOCATED. These five steps are summarized below and then explained in detail in the remainder of this
manual.
4.1 CONFIRM QUALITY OF SERVICE FOR VOICE CALLS
First, you will be confirming that Telguard's SIM Card is correctly installed into the unit and cellular service is activated.
This is the most important step in the installation, since the programming parameters contain all the necessary
information for successful communications. Also, you will confirm that Telguard has adequate cellular signal
strength and Quality of Service for voice.
4.2 TRANSMIT C/C ALARMS OVER THE TELCO CONNECTION
Once you have confirmed that the unit is active and the voice quality is good, you will be ready to verify that
the C/C is programmed properly. This step is important to verify that the C/C is programmed with valid
account code and central station information before transmitting signals through the cellular network.
4.3 TRANSMIT C/C ALARMS OVER THE CELLULAR RADIO NETWORK
Next, you will be connecting the C/C's digital dialer output to Telguard and verifying that alarm signals can be
reliably sent through Telguard over cellular to the central station digital receiver. The incoming Telco line is
not connected to Telguard during this step.
4.4 CONNECT SUPERVISORY TRIP OUTPUTS
Telguard's supervisory trip outputs are connected to the C/C and then tested.
4.5 COMPLETE THE INSTALLATION
Your last step will be to check the jumper setting of J10 (LED mode, out = normal), attach earth ground, and
permanently mount the unit.
* * * *
With this overview of the installation in mind, you should now proceed with the actual installation, following
the steps described in the remainder of this manual. Experienced installers following these steps can usually
install Telguard in new installations with good signal strength in a maximum of 30 minutes and in
retrofit/existing installations in a maximum of one hour.