User's Manual

MBS USER AND
INSTALLATION
MANUAL
Code: D148X01PT_DDS06
Date: 14-Nov-2014 Page: 9 of 41
01.01.00/1 Rev.1
EN 60068-2-64
* No functional:
• Duration: 30 minutes by axe
• 5-20 Hz. ASD: 1 m2/s3.
• 20-200 Hz. ASD; - 3dB/oct
Environmental testing -- Part 2-64: Tests - Test Fh:
Vibration, broadband random and guidance.
EN 60068-2-6
* No functional:
• Duration: 5 sweep by axe
5-9 Hz. Displacement 1.2 mm.
• 9-200 Hz. Acceleration 4 m/s2
Environmental testing -- Part 2-6: Tests - Test Fc:
Vibration (sinusoidal).
UNE-EN 60598
* Vibration type: Sine swept
* Frequency range: From 10 to 55 Hz
* Amplitude (peak):
• 10 Hz Amplitude (peak): 1.4 mm
38 Hz Amplitude (peak): 20 m/s2
• 55 Hz Amplitude (peak): 20 m/s2
* Number of axes: 3 axes
* Swept ratio: 1 Oct./min.
* Duration: 30 min./axis
Vibration: simulation of the fixing between MBS unit
and mast.
Eurocode UNE-EN 1991-1-4
* Wind speed: 200 km/h (55.55 m/s) (Safety
factor 1.5)
* Height in post: 20 m
Protection for avoiding damages either in the
enclosure and the fixing parts, due to meteo effects
such as strong gusts of wind.
4.3.2. STANDARDS MIL-STD 810G
MIL-STD-810G METHOD 502.5 procedure I,
(C2): -40 ºC. Duration: 72 h
Cold (Storage and transportation).
MIL-STD-810G METHOD 502.5 procedure I,
(C1): -30 ºC. Duration: 16 h
Cold (Operation).
MIL-STD-810G METHOD 501.5 procedure I
(A1): +85ºC. Duration: 72 h
Dry Heat (Storage and transportation).
MIL-STD-810G METHOD 501.5 procedure I
(A2): +60ºC. Duration: 16 h
Dry Heat (Operation).
MIL-STD-810G - Method 507.5, procedure II
(Aggravated): (10 cycles, 24 hours) 30º-60ºC
at 95%rH.
Humidity.
MIL-STD-810G - Method 509.5
672 hours. +35 ºC +/- 2 ºC. 5% ClNa.
Salt Fog.
MIL-STD-810G - Method 505.5:
- Proc. B: 20 hours of solar radiation and
4 hours of darkness
- Temperature: +40 ºC
- Humidity: 65%
- Duration: 10 days
Solar Radiation (Sunshine).