User's Manual
MBS USER AND
INSTALLATION
MANUAL
Code: D148X01PT_DDS06
Date: 14-Nov-2014 Page: 40 of 41
01.01.00/1 Rev.1
7. START UP/CONFIGURATION/VERIFICATION
IMPORTANT:
Ensure that the power supply of the MBS Unit is the proper
one before switch it on; an erroneous power supply can cause damages in
the equipment.
Every MBS Unit has in its labelling the diverse options that it offers. If the
MBS Unit includes the option O148017, this it will have to be powered with
AC (220/110 VAC), however, if the MBS Unit includes the option O148018 it
will have to be powerred with +24 VDC nominal voltage.
Preliminary considerations for carrying out the MBS Unit start up:
· To start up the equipment, this must have the final IP correctly configured (see
chapter of infrastructure configuration (F067220) in the Technical Manual).
· Refer to the radio link used to configure this device. Make sure this element is
properly connected to ground.
The steps to perform the final settings are:
1.
Before connecting power supply to the MBS Unit, make sure the right voltage level
reaches the power supply cable connector.
2.
Provide p
ower
to
the
MBS
Units throu
gh the
POWER_IN
connector
.
3.
Wait for the MBS Unit initialization (about 3 minutes).
4.
Verify that you have access to the MBS (by performing a "ping"). Make partial checks in
case of no response from the MBS, perform pings to intermediate elements: SNI à Node
radio link à remote site radio link à MBS.
5.
From NMS, register the MBS Unit(s), completing the necessary settings (see chapter of
infrastructure configuration, F067220, and the client's user manual NMS, F067201).
6.
Verify the absence of alarms in monitoring module and check with a radio terminal that it is
registered and you can make and receive calls. In case of interference or coverage fault
alarms see chapter of the infrastructure adjustment (F067218).