Chapter 2: Commissioning Steps
BreezeCOMPACT Commissioning
¾ To install the BreezeCOMPACT hardware on a pole:
1
Follow the hardware installation instructions provided in the quick installation guides for
the various BreezeCOMPACT devices.
2
Connect DATA1 or/and DATA2 to the network.
3
Install the GPS and connect the GPS cable.
After the eNodeB is up, it is discovered automatically by BreezeVIEW.
You can configure the eNodeB using:
7
BreezeVIEW configuration methods (such as Manual and Template). For more details, see
Section 3.3.6, Configuring Via BreezeVIEW.
8
A direct SSH connection to an external management IP address in order to use the
management CLI. For more details, see Chapter 3, Operation and Administration
Procedures.
5. Please verify if the equipment installed properly. The PWR (Power) and GPS LEDs status
should be GREEN.