User's Manual
Table Of Contents
EcoSource Low Voltage Installation
Low Voltage Installation
Always ensure power has been turned off before starting installation.
EcoSource Low Voltage Required Equipment
• EcoSource (P/N: SS6500)
• EcoTouch (P/N: SS6560)
• Voltmeter
• Level
• Phillips Head Screwdriver
• Precision Screwdriver
• UL rated insulating tape
• Wire stripper
• Wire nuts
Additional Hardware Required for Drywall Mount
• Four 50 lb. EZ-Lock anchors and provided screws
Additional Hardware Required for VERTICAL JBOX Mount
• Telkonet JBOX Adapter Plate
• Two #6-32 1” screws
• Four $5 ½” coarse thread screws
Additional Hardware Required for HORIZONTAL JBOX Mount
• Two #6-32 1” screws
• 1 Speed Nut (flat-type speed nut fastener that accommodates a #6-32 1” screw as shown in Figure
12.
Figure 12-Speed Nut
Installation Instructions Common to All Three Low Voltage Options
Step 1 If applicable, determine the location in the room where the thermostat will be installed. (See
EcoTouch Thermostat Location Planning section, page 24.)
EcoWave Featuring EcoTouch IO&M Guide Telkonet, Inc.
For Use with Firmware Version 2.x 20800 Swenson Drive, Suite 175
EcoSour ce Waukesha, WI 53186
Revision 2 (800) 380-9640
Page 14 www.telkonet.com