User's Manual
High Voltage Installation (Non-Class 2)
EcoInsight+ SS6010
I, O & M Guide
Telkonet, Inc.
For Use with Firmware Version 2.x
20800 Swenson Drive, Suite 175
High Voltage Installation (Non-Class 2)
Waukesha, WI 53186
Revision 2.1
(800) 380-9640
Page 7
www.telkonet.com
High Voltage Installation (Non-Class 2)
(Note: for Low Voltage Installation instructions, see page 16.)
Required Equipment
SS6010 (included)
High Voltage Backplate (included)
Molex harnesses as applicable (included)
Telkonet High Voltage JBOX Adapter Plate
(included)
JBOX
Two #6-32 1” screws
Four #5 ½” coarse thread screws Voltmeter
Level
Phillips screwdriver
UL rated insulating tape
Wire stripper
Wire nuts
Installation
For all high voltage installations a single gang mud ring must be mounted VERTICALLY on a
JBOX. A Telkonet JBOX Adapter Plate is required for all JBOX installations.