User's Manual
Table Of Contents
- 1 Overall Architecture Of 1x1 Test System 2.1
- 2 Hardware Platform Building
- 2.1 Check External Antenna
- 2.2 Cable connection
- 2.2.1 Connection points on EVK daughter board
- 2.2.2 Cable connection between EVK daughter board and PCB antenna
- 2.2.3 Cable connection between EVK daughter board and buzzer
- 2.2.4 Cable connection between EVK daughter board and Mechanical structure
- 2.2.5 Cable connection between EVK daughter board and DUT
- 2.2.6 Other cable connection
- 3 Firmware Burning For EVK Daughter Board
- 4 Observe Test Result Via PC Software EvkMonitor
- 5 Update PCBA (DUT) Firmware
- Appendix 1 Test Item List On PC Software “EvkMonitor”
- Appendix 2:Hardware List
- Appendix 3:Dimension chart of EVK daughter board and buzzer board
Assembly And Maintenance Manual for Telink Test System 2.1
AN-16052600-E3 6 Ver 1.2.0
The buzzer module is used for Amic test, and it should be placed as close to Amic
as possible.
Note: Do not contact buzzer board with Amic directly, and there should be no
obstacle between them.
4) A PC. On PC side, the EvkMonitor tool can be used to burn firmware for EVK
daughter board (refer to Section 3), and user can also observe test result via the
EvkMonitor (refer to Section 4).
Figure below shows the system connection chart.
EVK
DUT
GPIO
SWire
Power
Display
LED1
LED2
LED3
LED4
BUTTON
PCB
Antenna
ANT
Digital
buzzer
GPIO
Power
PC
USB
Figure 4 System connection chart