User's Manual
Table Of Contents
- 1 Overall Architecture Of 1x1 Test System 2.1
- 2 Hardware Platform Building
- 2.1 Check External Antenna
- 2.2 Cable connection
- 2.2.1 Connection points on EVK daughter board
- 2.2.2 Cable connection between EVK daughter board and PCB antenna
- 2.2.3 Cable connection between EVK daughter board and buzzer
- 2.2.4 Cable connection between EVK daughter board and Mechanical structure
- 2.2.5 Cable connection between EVK daughter board and DUT
- 2.2.6 Other cable connection
- 3 Firmware Burning For EVK Daughter Board
- 4 Observe Test Result Via PC Software EvkMonitor
- 5 Update PCBA (DUT) Firmware
- Appendix 1 Test Item List On PC Software “EvkMonitor”
- Appendix 2:Hardware List
- Appendix 3:Dimension chart of EVK daughter board and buzzer board
Assembly And Maintenance Manual for Telink Test System 2.1
AN-16052600-E3 20 Ver 1.2.0
status: As shown in mark 7 of Figure 13, it serves to display running state of the
EVK.
The figure above indicates the state of “Ongoing”.
The figure above indicates the state of “Success”.
The figure above indicates the state of “Failure”.
For convenience of subsequent maintenance, it’s highly recommended to mark
the error items and classify them.
data: As shown in mark 8 of Figure 13, it serves to display test result.
Please refer to Appendix 1 Test Item List On PC Software “EvkMonitor” for
details about test items and corresponding maintenance suggestions.