User's Manual
Table Of Contents
- 1 Overall Architecture Of 1x1 Test System 2.1
- 2 Hardware Platform Building
- 2.1 Check External Antenna
- 2.2 Cable connection
- 2.2.1 Connection points on EVK daughter board
- 2.2.2 Cable connection between EVK daughter board and PCB antenna
- 2.2.3 Cable connection between EVK daughter board and buzzer
- 2.2.4 Cable connection between EVK daughter board and Mechanical structure
- 2.2.5 Cable connection between EVK daughter board and DUT
- 2.2.6 Other cable connection
- 3 Firmware Burning For EVK Daughter Board
- 4 Observe Test Result Via PC Software EvkMonitor
- 5 Update PCBA (DUT) Firmware
- Appendix 1 Test Item List On PC Software “EvkMonitor”
- Appendix 2:Hardware List
- Appendix 3:Dimension chart of EVK daughter board and buzzer board
Assembly And Maintenance Manual for Telink Test System 2.1
AN-16052600-E3 19 Ver 1.2.0
show log: Tick the “show log” box (as shown in mark 1 of Figure 13) to enable
the “log window” to display dynamic information.
log window: As shown in mark 2 of Figure 13, it’s the area to display dynamic
information.
Stop: As shown in mark 3 of Figure 13, the software is in the state of stop by
default.
File: Click “open” under the “File” menu (as shown in mark 4 of Figure 13), a
window to set the storage path for database files will pop up.
Select the storage path as needed, input file name and then click the “Open”
button. Test result will be automatically stored under the directory by the
software.
Note:Only storage path and file name in English are allowed, otherwise it will
invalidate the database creation.
start: Click the “start” icon (as shown in mark 5 of Figure 13), the software enters
the state waiting for receiving the test result.
Run: Click the “Run” icon (as shown in mark 6 of Figure 13) to start testing.