User's Manual
Table Of Contents
- 1 Overall Architecture Of 1x1 Test System 2.1
- 2 Hardware Platform Building
- 2.1 Check External Antenna
- 2.2 Cable connection
- 2.2.1 Connection points on EVK daughter board
- 2.2.2 Cable connection between EVK daughter board and PCB antenna
- 2.2.3 Cable connection between EVK daughter board and buzzer
- 2.2.4 Cable connection between EVK daughter board and Mechanical structure
- 2.2.5 Cable connection between EVK daughter board and DUT
- 2.2.6 Other cable connection
- 3 Firmware Burning For EVK Daughter Board
- 4 Observe Test Result Via PC Software EvkMonitor
- 5 Update PCBA (DUT) Firmware
- Appendix 1 Test Item List On PC Software “EvkMonitor”
- Appendix 2:Hardware List
- Appendix 3:Dimension chart of EVK daughter board and buzzer board
Assembly And Maintenance Manual for Telink Test System 2.1
AN-16052600-E3 17 Ver 1.2.0
During first time of firmware burning, it’s needed to configure product
information (product.ini) for the EVK daughter board. Tick the “USB Id” box and set
“Evk number” as “0” (always).
Then click the “Download” button to start burning. The log window keeps
scrolling until it’s as shown in the figure below.
Now the EVK daughter board is already burned with evk_testbench.bin, test.tls,
product.ini, id and other bin files in the folder.
After power cycle, the EVK daughter board is ready for use.